OUR BUILD DIARY

The extension blog

Follow our extension from the garden before we started through demolition, drainage, foundations and building the walls. Read the whole story or explore a stage of the build.

38 progress articles · Entries without exact dates follow the build sequence.

End of summer 2020 · Posted 23 October 2020

The garden before we started

This is the back garden as it looked at the end of the summer, before work began. The block paving stretches right up to the back of the house, although you can’t see all of it in the photo.

Preparation & demolition

Read article →

Early September 2020 · Posted 23 October 2020

Making room for the extension

The first stage was to move the shed and demolish the existing brick outbuilding and rear porch. We started in early September, while we were in quarantine after our summer holiday.

Preparation & demolition

Read article →

Early October 2020

Starting the drainage work

We’ve made a start on the new foul drainage. One of the two existing inspection chambers sits within the footprint of the extension, and the other is where the new rear wall will go. We’re also adding an ensuite, so the drainage layout needs to accommodate that too.

Drainage & services · Planning & decisions

Read article →

Date to confirm

Digging the drainage trenches by hand

A little more progress on the drainage trenches. I’m managing about an hour in the evenings after work, although the nights are drawing in, so I’m not sure how much longer I’ll be able to keep that up.

Drainage & services

Read article →

Date to confirm

Ordering the drainage materials

More digging today brings us up to date. I’ve ordered the new inspection chambers, pea gravel and some six-metre lengths of pipe. I’ll try to finish preparing the trenches this weekend.

Drainage & services

Read article →

19 November 2020

Mud, rain and a revised drainage plan

The rain has been relentless for a few weeks, and the days are getting shorter. Our heavy clay soil turns first into a sticky mess, then a sloppy one. When wet, it’s heavier to shift, clings to the shovel and leaves our boots sticking to the bottom of the trench. Progress is slow.

Drainage & services · Planning & decisions

Read article →

Date to confirm

The drains are signed off

There hasn’t been much progress over the past few weeks, with Christmas and everything else going on. We’ve also been waiting for the building inspector to approve the new underground drainage before going any further.

Drainage & services

Read article →

Date to confirm

Drainage finished and foundations booked

We’ve backfilled the trenches for the new drains. It took longer than expected because the backfill needed to be free of stones larger than 40mm and lumps of clay larger than 150mm. Our soil was full of both, so there was plenty of sorting to do.

Drainage & services · Foundations · Planning & decisions

Read article →

Date to confirm

Digging the foundations

The groundworkers arrived this morning. We removed a panel from our neighbours’ fence and brought the digger across the gardens without any problems.

Foundations

Read article →

Date to confirm

Pouring the foundations

The building inspector came today to inspect the trenches. He only stayed a few minutes, as he was happy with what he saw, and we were cleared to pour the foundations.

Foundations · Floor slab

Read article →

30 January · Year to confirm (original entry says 2020)

Adding rocker pipes to the drainage

We added flexible joints to the underground drainage where the pipe passes through the foundation. These short sections, known as rocker pipes, allow for differential movement between the pipework and the foundations.

Drainage & services · Foundations

Read article →

6 February 2021

Moving the main water supply

Before we could start laying hardcore in the extension’s floor area, we needed to move the main water supply pipe from the back of the house.

Drainage & services · Floor slab

Read article →

9 February 2021

Preparing the floor sub-base

We’ve started moving the hardcore into place to prepare the sub-base for the floor slab. First, we laid a membrane intended to help stabilise the ground.

Floor slab · Walls & steels

Read article →

17 April 2021

Starting the blockwork

With the nights getting a little warmer, we were able to start the blockwork on Saturday afternoon. It feels great to get going at last.

Walls & steels

Read article →

17 May 2021

The windposts have arrived

The steel windposts have finally arrived, so after a two-week break we can get going again. While we were waiting, we built the first part of our new deck at the bottom of the garden.

Walls & steels

Read article →

17 June 2021

Progress below ground and up to floor level

Since the last update, we’ve been making the most of the nice weather, so the building work has taken a bit of a back seat. Looking back over everything we’ve done, though, it feels like good progress.

Drainage & services · Floor slab · Walls & steels

Read article →

2 July 2021

Compacting the hardcore

The hardcore was ready to be compacted, so we hired a wacker plate for the week. In a few places, it settled more than we had expected, and we had to add extra hardcore to bring it back up to the right level.

Floor slab

Read article →

8 July 2021

Ready to pour the floor slab

The building inspector came today for his first visit since before the foundations were poured. He didn’t stay long and was very happy with everything we had done.

Floor slab

Read article →

9 July 2021

Concrete day

Today was concrete day. When I called earlier in the week to book the delivery, there wasn’t a concrete pump available for another two weeks. There was, however, an early morning delivery slot at 7.30am today.

Floor slab

Read article →

15 July 2021

Starting the superstructure

We’ve started on the superstructure—the walls above damp course level. The first job was to fix the wall starter kit, which will tie the extension to the existing house.

Walls & steels

Read article →

22 July 2021

The blockwork is going up!

The blockwork is going up! It has been too hot to work during the day, so we’ve fitted in a couple of evenings this week and last. I also went hiking at the weekend.

Walls & steels

Read article →

7 August 2021

The walls are getting higher

The walls are slowly getting higher, and we’re now close to head height on both sides of the extension. It’s encouraging to see the structure taking shape.

Walls & steels

Read article →
Our Extension Project

Our experience of planning, building and finishing our own home extension — including the costs, mistakes, DIY jobs and things we learned along the way.